Visions from the Underworld - Slide 52 |
| Something a little more down-to-earth hidden by closed doors - incompetence. Platform 26 of Sydney's Central Station was fully built along with other ones below, above and alongside it, though it was decided not to construct the tunnels to bring in trains because the proximity to other tunnels might lead to a tunnel collapsing. |
![]() ![]() |
(c) orchy (
) and s/// 1998.